
Precasters: Trent Concrete
The idea of The Trafford Centre was conceived in 1984. Planning permission was sought in 1986 and approval was finally upheld by the House of Lords in 1995. It took 27 months to build and opened on 10 September 1998.
The Trafford Centre site covers 150 acres and contains 118,766sq.metres of retail and 29,954sq.metres of catering and leisure space.
J&P Building Systems in put into this building was the design and supply of the PFIEFER column shoe connection systems. Also supplying the innovative RVK units, from SB productions.


|